FOR SALE THE FOLL
DRILLSHIP:
-PELICAN CLASS DP2 DRILLSHIP
-CAPABLE OF OPERATING IN 5,000 FT. OF WATER
-DRILLING DEPTHS OF UP TO 25,000 FT
-ACCOMMODATIONS OF 139 PERSONNEL
-EQUIPPED WITH CYBERBASE DRILLING CABIN
-VARCO TDS4H TOP DRIVE AND THREE (3) MUD PUMPS NATIONAL 12P160.
JASPER EXPLORER SINGAPORE FLAG
==============
BLT 1973 UPGRADED 2009
DESIGN UPGRADED PELICAN CLASS
CLASS DNV DYNPOS AUTR
DIMS: LOA 165.30 M BEAM, MAIN DECK 29.75 M HULL DEPTH 12.50 M
SUMMER DRAFT 7.50 M (EXCLUDING THRUSTERS) 11.40 M (INCLUDING
THRUSTERS)
LIGHTSHIP 11,787 MT
VARIABLE LOAD 8,354 MT
WATER DEPTH 5,000 FT.
DRILLING DEPTH 25,000 FT.
TRANSIT SPEED 9 KNOTS
ESTIMATED FUEL CONS: TRANSIT: 25 M3/ DAY DP MODE: 45 M3/ DAY
HELIDECK SUITABLE FOR SIKORSKY S-92 OR SIMILAR; CAP 437
ACCOMMODATION FULLY AIR-CONDITIONED FOR 139 PERSONS WITH GALLEY, MESSES RECREATION ROOMS, OFFICES AND HOSPITAL
=== DETS WOG ===
MAJORITY OF THE TOP SIDE EQUIPMENT INCLUDING THE DERRICK, CROWN MOUNTED MOTION COMPENSATOR AND RISER TENSIONING SYSTEM WERE REPLACED DURING THE UPGRADING PROJECT IN 2009. RIG FLOOR UTILITIES WERE FITTED WITH NEW PIPE HANDLING, IRON ROUGHNECK, MANIPULATOR ARMS AND CHERRY PICKERS FOR UPGRADED SAFETY AND PERFORMANCE CAPABILITIES.
PROMPTLY AVAILABLE AT WEST COAST AFRICA.
DRILLSHIP:
-PELICAN CLASS DP2 DRILLSHIP
-CAPABLE OF OPERATING IN 5,000 FT. OF WATER
-DRILLING DEPTHS OF UP TO 25,000 FT
-ACCOMMODATIONS OF 139 PERSONNEL
-EQUIPPED WITH CYBERBASE DRILLING CABIN
-VARCO TDS4H TOP DRIVE AND THREE (3) MUD PUMPS NATIONAL 12P160.
JASPER EXPLORER SINGAPORE FLAG
==============
BLT 1973 UPGRADED 2009
DESIGN UPGRADED PELICAN CLASS
CLASS DNV DYNPOS AUTR
DIMS: LOA 165.30 M BEAM, MAIN DECK 29.75 M HULL DEPTH 12.50 M
SUMMER DRAFT 7.50 M (EXCLUDING THRUSTERS) 11.40 M (INCLUDING
THRUSTERS)
LIGHTSHIP 11,787 MT
VARIABLE LOAD 8,354 MT
WATER DEPTH 5,000 FT.
DRILLING DEPTH 25,000 FT.
TRANSIT SPEED 9 KNOTS
ESTIMATED FUEL CONS: TRANSIT: 25 M3/ DAY DP MODE: 45 M3/ DAY
HELIDECK SUITABLE FOR SIKORSKY S-92 OR SIMILAR; CAP 437
ACCOMMODATION FULLY AIR-CONDITIONED FOR 139 PERSONS WITH GALLEY, MESSES RECREATION ROOMS, OFFICES AND HOSPITAL
=== DETS WOG ===
MAJORITY OF THE TOP SIDE EQUIPMENT INCLUDING THE DERRICK, CROWN MOUNTED MOTION COMPENSATOR AND RISER TENSIONING SYSTEM WERE REPLACED DURING THE UPGRADING PROJECT IN 2009. RIG FLOOR UTILITIES WERE FITTED WITH NEW PIPE HANDLING, IRON ROUGHNECK, MANIPULATOR ARMS AND CHERRY PICKERS FOR UPGRADED SAFETY AND PERFORMANCE CAPABILITIES.
PROMPTLY AVAILABLE AT WEST COAST AFRICA.
No comments:
Post a Comment