for sale following tween
VERY GOOD PRICE WITH SS/DD PASSED!.We suggest inspection
===================
MV "SHINLINE 9" (EX-ORIENTAL HERO)
===============
ABT 7009 DWT ON 7,43M DRAFT
BUILT AUGUST 1990 SHIN KOCHIJYUKO CO., LTD., JAPAN
CLASS NK SS/DD DUE MARCH 2015
GT/NT 5,554/2,337 MTS
DIMS: LOA 98.17 X BEAM 18.80 X DEPTH 12.90 METRES
2 HOLDS / 2 HATCHES
GRAIN / BALE 13,559 / 12,594 CBM
HATCHCOVERS TYPE : MCGREGOR SINGLE PULL
GRAIN / BALE 13,647 M3 / 12,484 M3
DERRICKS 4 X 20 T
M/ENGINE MAKITA 2SA5CY OF 2,500 KW @ 200 RPM
=== (DTLS W.O.G.) ===
Vessel’s last discharge port during this voyage is likely
to be NAGOYA/JAPAN where ETA 23rd Feb - upon completion she will ballast
to MIRI/MALAYSIA for dry-docking to pass her SS.
VERY GOOD PRICE WITH SS/DD PASSED!.We suggest inspection
===================
MV "SHINLINE 9" (EX-ORIENTAL HERO)
===============
ABT 7009 DWT ON 7,43M DRAFT
BUILT AUGUST 1990 SHIN KOCHIJYUKO CO., LTD., JAPAN
CLASS NK SS/DD DUE MARCH 2015
GT/NT 5,554/2,337 MTS
DIMS: LOA 98.17 X BEAM 18.80 X DEPTH 12.90 METRES
2 HOLDS / 2 HATCHES
GRAIN / BALE 13,559 / 12,594 CBM
HATCHCOVERS TYPE : MCGREGOR SINGLE PULL
GRAIN / BALE 13,647 M3 / 12,484 M3
DERRICKS 4 X 20 T
M/ENGINE MAKITA 2SA5CY OF 2,500 KW @ 200 RPM
=== (DTLS W.O.G.) ===
Vessel’s last discharge port during this voyage is likely
to be NAGOYA/JAPAN where ETA 23rd Feb - upon completion she will ballast
to MIRI/MALAYSIA for dry-docking to pass her SS.
No comments:
Post a Comment